SLS Group
Connect

Jl. Diamond Park Residence, Permata Inti Juanda B-1,
Sidoarjo, 61253
Jawa Timur, Indonesia

admin@slsgroup.id

SLS and Subsidiary Companies

Coal Mining Company

PT. Mahakam Multi Lestari

Mahakam Multi Lestari has total area of 5.000ha with 5km distance to AKM’s jetty which is very strategic to SLS. SLK, which is majority owned by SLS will become the mining contractor in MML from overburden, coal getting, coal hauling, and other mining related activities.

Coal loading terminal facility will be handled by AKM, which is also majority owned by SLS. It has been proven that MML has around of 40.000.000 MT of coal deposit with GAR 34 quality from 1000ha area. More exploration needed to be done and we are convinced that the deposit will increase. MML plans to increase production from 1,2MT per annum to 4,8MT starting in quarter 3 of 2023.

Projects MML
  • Project Location
  • Cooperation System
  • Cooperation Duration
  • Scope of Work
  • Project Value
  • Description
  • Stripping Ratio (SR)
  • Gross As Received (GAR)
  • Ash
  • Total Sulfur (TS)
  • Hauling Distance
  • Port
  • Contractor
  • Annual Production Achievement
  • Annual Production Plan
  • -
  • Joint Operation (Profit Sharing)
  • 1465ha with 10 years (can be extended)
  • Coal Mining
  • $ 1,200,000,000
  • 40.000.000 MT
  • 4
  • 3400
  • <4.2
  • <0.3
  • 6 km
  • PT. Abyakta Kirana Mahakam (AKM)
  • PT. Sasmaka Lestari Karya (SLK)
  • 600.000 MT (2022)
  • 2.200.000 MT (2023